Technical articles

22 Ottobre 2020

Acoustic parameter for timber buildings (part 3)

Impact sound insulation: how it relates to regulations and acoustic comfort.
22 Ottobre 2020

Acoustic parameter for timber buildings (part 2)

Impact sound insulation: how it is predicted and improved.
21 Ottobre 2020

Acoustic parameter for timber buildings (part 1)

Impact sound insulation: how it is measured and a quick glance at its underlaying physics.
24 Febbraio 2020

Tjiko

Since the beginning (2007), Ergodomus has always firmly believed in off-site construction and in the need of improving the building sector.
17 Ottobre 2019

Mass Timber Plants Growing Outside of Europe by Paul Kremer

Throughout 2019 we have seen some amazing achievements in the mass timber market around the world.
7 Maggio 2019

Tall timber building – The results of the survey

It’s always interesting and at the same time important, to understand the opinion of the different type of figures who work in the world of timber […]
15 Gennaio 2019

U shaped membrane against moisture: problem or solution?

We often discuss with clients/colleagues the role of U shaped membranes, which is a system applied at the bottom of timber based walls to prevent from […]
3 Ottobre 2018

Tall timber building: what’s your opinion?

After the exponential growth of CLT  production and the sprawling of multistory timber buildings all over world, the target seems to move toward tall timber constructions. […]
1 Luglio 2018

Timber buildings: how long do they last? (Part 1)

One of the most common questions we are asked is this: “How long does a wooden building last?”. The answer of the question is complex and […]
15 Giugno 2018

CLT oversea: Find out how we did it!

In this article we will try to highlight the main aspects and limits of container transport based on our experience gained on oversea sites.
16 Maggio 2018

Connection between platform frame walls and concrete using hold-downs

The correct design of a frame building involves a series of precautions necessary in order to guarantee the fulfillment of the static requirements in compliance with […]
9 Aprile 2018

Window-wall detail

The window is a weak point in the envelope of the building and must therefore be considered very carefully during the design phase keeping in mind […]
7 Marzo 2018

Eggstrordinary engineering!

Spring is in the air and Easter will soon be upon us. That means it is time for the annual Ergodomus Egg Competition.
12 Gennaio 2018

Wood Control – Monitoring moisture content

“is early identification and reporting of this problem possible, before the situation gets out of hand?”.
18 Dicembre 2017

How to see the noise: Beamforming

Failure to comply with acoustic parameters is often the subject of legal disputes but above all searching “in the dark” to identify the source and solve the problem.
Newsletter subscription
Follow us on Linkedin!

Linkedin is our professional social network.

Keep in touch with us!